Route and trench preparation
7 items- Review of the approved sewer route and connection points
- Confirmation of marked utilities within the work area
- Trench excavation to the documented depth and alignment
- Preparation of the trench bottom and specified bedding
- Maintenance of required slope based on provided elevations
- Care when approaching existing utilities and structures
- Management of excavated material and equipment access